Golden Rapture Mining Commences Exploration at its High-Grade Phillips Township Property
![]() | |||||||||
Edmonton, Alberta – TheNewswire - (April 16, 2025) – Golden Rapture Mining Corporation (CSE-GLDR) is pleased to announce that a high-resolution UAV airborne magnetics survey has commenced at its high-grade gold Phillips Township property, Ontario.
Golden Rapture’s Phillips Township Property is located in a Tier 1 mining jurisdiction. It is comprised of 225 contiguous claim cells totaling over 10,000 acres with high-grade gold, phenomenal infrastructure, easy access, and low cost of exploration with the company having access to its own in-house portable diamond drill.
The (UAV) airborne magnetics survey is being conducted by Rosor Exploration of Burlington, Ontario. The survey will be flown with a MagArrow magnetometer by Geometrics suspended from a Matrice 300 RTK drone along 50-meter spaced lines with a total of 493 line-kilometers covering an area of approximately 21 square kilometers.
This high-resolution (UAV) airborne magnetics survey will cover some of the most prospective areas of our Phillips Township, where 18 mine shafts exist. This survey is expected to yield critical data that will enhance our targeting of additional gold mineralization on the property. The survey is expected to take three to four weeks, depending on the weather and the time it takes for the geophysicist to process and image the survey data and provide us with a report. We are eager to review the survey results and explore the targets it identifies for further evaluation and follow-up.
It is the first time that all these gold systems are part of a single property. They include the high-grade Combined Mine, Mascotte Mine, Trojan Mine, Boulder Mine, Terrell Occurrence, OGS Occurrence, Kuluk Occurrence & the Young's Bay Occurrence, etc.
2024 Drilling Program
Our 2024 Combined Mine area drilling program, completed in October, included 23 shallow holes (average depth 100 ft) and saw results as high as 285.00 g/t Au. Highlights included 114.96 g/t Au across 2.55 meters in Hole 12, 111.16 g/t Au across 1.50 meters in Hole 17 and 11.74 g/t Au across 4.40 meters in Hole 11.
2024 Highlights of Drill Results from our Combined Mine Area:
Hole No. |
Dip |
From (m) |
To (m) |
Interval (m) |
Au g/t Results |
GRM24-09 |
66° |
24.00 |
25.00 |
1.00 m |
1.35 g/t |
GRM24-09 |
66° |
25.50 |
26.00 |
0.50 m |
8.62 g/t |
GRM24-10 |
66° |
13.50 |
14.50 |
1.00 m |
8.90 g/t |
Including |
66° |
14.00 |
14.50 |
0.50 m |
14.20 g/t |
GRM24-11 |
66° |
15.50 |
16.00 |
0.50 m |
5.64 g/t |
GRM24-11 |
66° |
17.00 |
19.00 |
2.00 m |
4.79 g/t |
Including |
66° |
18.00 |
19.00 |
1.00 m |
7.61 g/t |
GRM24-11 |
66° |
19.00 |
24.00 |
5.00 m |
1.07 g/t |
GRM24-12 |
66° |
22.75 |
25.30 |
2.55 m |
114.96 g/t |
Including |
66° |
22.75 |
23.25 |
0.50 m |
285.00 g/t |
GRM24-12A |
45° |
5.75 |
6.30 |
0.55 m |
55.04 g/t |
GRM24-13 |
45° |
5.50 |
6.30 |
0.80 m |
17.40 g/t |
GRM24-14 |
45° |
6.50 |
7.50 |
1.00 m |
3.73 g/t |
GRM24-16 |
45° |
6.00 |
6.50 |
0.50 m |
1.10 g/t |
GRM24-17 |
45° |
6.50 |
8.00 |
1.50 m |
111.16 g/t |
Including |
45° |
6.50 |
7.00 |
0.50 m |
252.00 g/t |
GRM24-18 |
45° |
12.00 |
13.00 |
1.00 m |
8.09 g/t |
Including |
45° |
12.00 |
12.50 |
0.50 m |
13.90 g/t |
GRM24-19 |
55° |
4.50 |
11.00 |
6.50 m |
2.05 g/t |
including |
55° |
5.50 |
6.00 |
0.50 m |
5.65 g/t |
including |
55° |
8.50 |
9.00 |
0.50 m |
5.77 g/t |
including |
55° |
10.50 |
11.00 |
0.50 m |
3.68 g/t |
GRM24-21 |
57° |
18.50 |
19.50 |
1.00 m |
23.20 g/t |
GRM24-21 |
57° |
21.50 |
22.50 |
1.00 m |
2.93 g/t |
GRM24-22 |
70° |
18.10 |
22.50 |
4.40 m |
11.74 g/t |
Including |
70° |
19.20 |
19.70 |
0.50 m |
59.99 g/t |
Including |
70° |
19.70 |
20.20 |
0.50 m |
37.99 g/t |
Including |
70° |
22.00 |
22.50 |
0.50 m |
5.27 g/t |
GRM24-23 |
45° |
14.00 |
15.00 |
1.00 m |
1.25 g/t |
Richard Rivet, President and CEO, commented:
“These new 23 shallow high-grade drill holes and the past 33 historical drill holes, combined with the large piles of gold-bearing quartz material on the surface, highlight the potential that the Combined Mine area may be amenable to open-pit mining. Also of significance is the fact that there is also over 3 kms of strike length with the Combined, Terrell, Mascotte, and Trojan Mine all lining up on the same fault structure, reinforcing additional potential with only the Combined Mine area having been drilled so far.”
Qualified Person
The technical disclosure in this news release has been reviewed and approved by John Archibald, P.Geo., Qualified Person as defined by National Instrument 43-101 of the Canadian Securities Administrators.
About Golden Rapture Mining
Golden Rapture Mining is a newly listed, well-funded exploration company engaged in the acquisition, exploration and development of high-potential assets. The company’s Phillips Township Property is located in the Rainy River District of NW Ontario and is comprised of 10,000-acres of highly prospective past-producing high-grade gold systems.
Golden Rapture has now been listed for 1 year with 37,469,390 shares presently issued.
On behalf of the Board
Richard Rivet,
President & CEO
Email: goldenrapture@outlook.com
Phone: 780-729-5395
For more info please look at our website at https://goldenrapturemining.com/
Forward-looking statements include predictions, projections, and forecasts and are often, but not always, identified by the use of words such as “seek”, “anticipate”, “believe”, “plan”, “estimate”, “forecast”, “expect”, “potential”, “project”, “target”, “schedule”, “budget” and “intend” and statements that an event or result “may”, “will”, “should”, “could” or “might” occur or be achieved and other similar expressions and includes the negatives thereof. All statements other than statements of historical fact included in this release, including, without limitation, statements regarding the Company’s planned exploration programs and drill programs and potential significance of results are forward-looking statements that involve various risks and uncertainties. There can be no assurance that such statements will prove to be accurate and actual results and future events could differ materially from those anticipated in such statements. Forward-looking statements are based on a number of material factors and assumptions. Important factors that could cause actual results to differ materially from Company’s expectations include actual exploration results, changes in project parameters as plans continue to be refined, results of future resource estimates, future metal prices, availability of capital, and financing on acceptable terms, general economic, market or business conditions, uninsured risks, regulatory changes, defects in title, availability of personnel, materials, and equipment on a timely basis, accidents or equipment breakdowns, delays in receiving government approvals, unanticipated environmental impacts on operations and costs to remedy same, and other exploration or other risks detailed herein and from time to time in the filings made by the Company with securities regulators. Although the Company has attempted to identify important factors that could cause actual actions, events, or results to differ from those described in forward-looking statements, there may be other factors that cause such actions, events, or results to differ materially from those anticipated. There can be no assurance that forward-looking statements will prove to be accurate, and accordingly readers are cautioned not to place undue reliance on forward-looking statements.